Project Background: Multiple low-lying areas and riverside sections in the urban area lack fixed pump stations, resulting in slow drainage of accumulated water during flood seasons and necessitating mobile pumping equipment.
Implementation Plan: Deploy floating pump units and high-capacity mobile dewatering pump stations based on water accumulation points, supported by generator sets and hose assemblies, with direct logistics delivery and coordinated on-site acceptance upon arrival.
Delivery Results: Rapid pumping operations were conducted multiple times during flood seasons, significantly reducing drainage time and ensuring traffic flow and resident safety.