Mobile Drainage Pump Deployment for an Urban District (Chengdu)

Mobile Drainage Pump Deployment for an Urban District (Chengdu)

Project Site: Chengdu · Scenario: Urban Flooding Drainage

Deployed high-flow mobile drainage pump stations and floating pumps across low-lying spots, shortening flood recession time.

Inquire About Similar Supply

Project Details

Project Background: Low-lying urban areas and underground spaces are prone to flooding during flood season, requiring high-capacity, rapidly deployable dewatering equipment to shorten flood recession time and ensure traffic accessibility.

Implementation Plan: Deploy high-capacity mobile dewatering pump stations and floating submersible pumps at flood-prone points, supported by generator sets and hose lines, with direct logistics delivery and coordinated on-site acceptance inspection upon arrival.

Delivery Results: Multiple rapid dewatering operations were carried out during the flood season, significantly reducing flood recession time and ensuring traffic safety and resident security.