Project Details
Project Background: Low-lying urban areas and underground spaces are prone to flooding during flood season, requiring high-capacity, rapidly deployable dewatering equipment to shorten flood recession time and ensure traffic accessibility.
Implementation Plan: Deploy high-capacity mobile dewatering pump stations and floating submersible pumps at flood-prone points, supported by generator sets and hose lines, with direct logistics delivery and coordinated on-site acceptance inspection upon arrival.
Delivery Results: Multiple rapid dewatering operations were carried out during the flood season, significantly reducing flood recession time and ensuring traffic safety and resident security.